West Bromwich Albion Indoor Facility

West Midlands, UK

Rubb Buildings won this contract following an extensive tendering process and went on to provide a turnkey indoor football training facility large enough to accommodate a full size football pitch.

 

Rubb rose to the challenge and provided an indoor football training building measuring 70m wide by 105m long with sidewalls of 7m. Rubb’s use of an I-beam column leg system as an alternative to lattice truss construction maximises the internal playing area.

 

West Bromwich Albion’s indoor training facility meets with all local building codes and post production hot dip galvanizing to BS ISO EN 1461 standards ensures steel surfaces are protected against corrosion.

 

The PVC coated polyester membrane cladding flies the club colours of dark blue and white and the translucent roof provides a bright and airy atmosphere. This helps reduce energy costs as artificial lighting is not required during the day.

Building Specifications

Usage

Usage

Sports

Usage

Type

BVC

Span

Span

70m

Usage

Length

105m

Usage

Eaves

7m

Usage

Apex

14.9m

Usage

Door

Double

Usage

Completed

10 / 2010

CONTACT RUBB

Contact the Rubb team with your building requirements. We are here to support you throughout your project.

VIEW BROCHURE

Explore the latest Rubb sports brochure. This brochure features the latest projects and structure information.