Rubb UK recently completed a re-sheet project for CHEP UK, a global leader in supply chain solutions. Originally constructed by Rubb in 1994, the 24m span, 36m long, 6m leg warehouse has been given a new lease of life.

After 30 years of heavy industrial use, the BVE structure has been fully re-sheeted with fresh fabric cladding and new tensioning fittings.

Featuring Rubb’s signature blue walls and white roof, natural light is maximised within the structure for a brighter working environment. Custom cutouts were also included in the new cladding to accommodate the facility’s paint line ventilation ducting.

None of the original hot-dip galvanised steel framework was replaced, which is still standing strong thanks to our robust design and anti-corrosion coating.

While Rubb was on site, CHEP asked us to install a new 3.3m x 4m electrically-operated roller shutter door. Customers that use Rubb’s re-sheet service often take the opportunity to upgrade their buildings.

Minimising disruption

CHEP UK required continuous operation of their production line throughout the re-sheeting process. We worked closely to plan and execute the replacement in sections, minimising disruption and allowing the facility to function without downtime.

This re-sheeting project revitalised CHEP’s facility, enhancing its functionality, light levels, and life cycle for significantly less than the cost of a new building. Why re-buy when you can re-sheet?

A great experience from start to finish. From the initial consultation to the finished building, Rubb provided a first-class experience with minimal disruption to our operation.

General Manager, Peterhead | CHEP UK Lee Donald

Tell us about your project


hello@rubbuk.com
+44 (0) 191 482 2211