Sunderland AFC Indoor Football Training Facility
Sunderland, UK
Sunderland, UK

Sunderland’s stars of the future began using the Rubb training hub at the Academy of Light, Cleadon following the official opening on December 7, 2012. Rubb pitched in with Tolent Construction Ltd and architects Red Box Design Group to make SAFC’s long-awaited training facility plans a reality.
This bespoke indoor football training facility features one of Rubb’s largest building span widths to date at 82.4m. The facility measures 64m long with sidewalls of 7.75m and a central internal clearance of 10m high.
The structure stands 12.5m high at its apex and comprises a galvanized steel frame, a white PVC-clad roof, a large gutter system, a Fullflow syphonic drainage system and four large vent roof cowls along the apex.
Its translucent roof allows natural daylight to illuminate the interior which includes a full size indoor 3G football pitch. The sidewalls and gables are constructed with stone-filled gabion cages up to 3.8m high with the upper part clad with Larch timber.

It's fantastic. It's currently being used by the Academy youngsters and been described as the best indoor football training facility at club level in the country. Rubb provided a bespoke solution for our requirements and ensured the available space was maximised. The team really delivered in the overall finish of the building, which shows the diversity of the product and service that Rubb provides.
Facilities Manager, SAFC Peter Weymes
Rubb's flexible, custom-designed solutions come in all shapes and sizes to give you the competitive edge.






You are currently viewing a placeholder content from Facebook. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More Information