WhoshouldIsee Tracks
west bromwich albion facility internal
Arrow down

West Bromwich Albion Indoor Facility

West Midlands, UK

Arrow down
west bromwich albion facility internal

Rubb provided a turnkey solution for West Bromwich Albion.

Rubb Buildings won this contract following an extensive tendering process and went on to provide a turnkey indoor football training facility large enough to accommodate a full size football pitch.

Rubb rose to the challenge and provided an indoor football training building measuring 70m wide by 105m long with sidewalls of 7m. Rubb’s use of an I-beam column leg system as an alternative to lattice truss construction maximises the internal playing area.

The PVC coated polyester membrane cladding flies the club colours of dark blue and white and the translucent roof provides a bright and airy atmosphere. This helps reduce energy costs as artificial lighting is not required during the day.

West Bromwich Albion’s indoor training facility meets with all local building codes and post production hot dip galvanizing to BS ISO EN 1461 standards ensures steel surfaces are protected against corrosion.